Always one step ahead
During the erection of flats for students of a university a future oriented planning and construction system was applied. Already during the planning phase the exact position of the supply lines was specified down to the smallest detail.
In order to meet these specifications also at site for walls and
ceiling passages, wbr produced appropriate metal sheets for the formwork sheets, which facilitated the work for the shell workers tremendously: For each passage the same system was available with exactly the same diameters at the right position.