Projects
The Company Products Our Strengths Projects / News Request / Ordering Service
upload/mediapool//186/Projekte_gross7.jpg upload/mediapool/Projekte_klein6.jpg
Reliable even in narrow time frames
Also for constructing prisons a quick progress is always demanded. If the outer walls are erected by pre-cast concrete elements U-shaped formwork are used for trough or slit formwork. By delivering many kilometers of precast strip foundation elements as trough formwork for adapting the pre-cast elements wbr managed at several modern prison buildings a quick start and meeting always the specified schedule.

Special models of formwork with toothed gaps are being used
for installations between reinforcement levels and for supporting ceilings and floors, as well as for general formwork. This is a cost saving alternative to conventional formwork, because these elements can remain in the concrete. Profiling and perforation create a suitable roughness, which ensures a force-closed connection between the construction elements.

Custom-made and ready for installation
We support the projects of our customers with custom made formwork systems made of profiled elements, individually prepared for the respective construction characteristics.

Ready to install Hydra foundation formwork can be installed in a very short period of time – without extensive machine equipment or special tools and with the lowest possible number of skilled people.