Assembly Instructions
The Company Products Our Strengths Projects / News Request / Ordering Service
upload/mediapool//186/Einbau1.jpg
Sheeting case pressed into the  concrete
upload/mediapool//186/Einbau2.jpg
Sheeting case fixed with  tie rod, e.g. bracing wire size 6 and wedge lock (tension lock)

upload/mediapool//186/Einbau3.jpg
Installed sheeting case with  bottom, with  tension bars against soil

Installation
The  installation into the  foundation is carried out by pressing the  sheeting case in the  unhardened concrete. After the  fixing of the  case in its final position and the hardening of the concrete, the  case is connected firmly with  the  concrete (at least one corrugation must be pressed inside the  unhardened concrete). The foundation can then be filled up.

If the foundation is to be produced in one process without a “foundation plate”, a bottom is required. The cases in practice are frequently fixed by supports.

The  tight interlocking of the strut and sheeting case is important for  the  function of the  block foundation. Careful grouting of the groove is indispensable.