The connection to the required assembly lengths is carried out on the construction site either by connecting individual pipes whose both ends are sealed with steel lids against the intrusion of concrete (finished assemblies) or by connecting the individual pipes with plug-in sockets, with only the first and the last pipe of the line being sealed with a lid (connected assemblies). Lines which consist of connected assemblies allow for the laying of supply lines through the hollow bodies.
Instead of sealing the pipes with steel lids, equipment with conical seals is possible. The implemented reduction of the pipe end lengths avoid undesired notch tensions.
A ventilation system for the individual pipes, or a joint ventilation of the pipe line can be provided or prepared by the manufacturer for the purpose of ventilation or drainage of the pipe lines.
If the displacement pipes are to be secured against lift, it is recommendable to apply the specifically developed Hydra single and double anchoring elements. They are tested for their static properties and guarantee utmost avoidance of showings, above all of rust stains at the bottom of the ceiling. The different assembling and disassembling methods of the supports allow for compliance with the individual requirements in the individual structures. it is possible to install and to remove the lift prevention locks exclusively from above, if this should be very difficult or impossible from below, due to the specific conditions.